When I joined Amazon, I needed to send millions of production records through a new service. This is also known as backfilling. A backfill is a process that applies updates or changes to existing records in a dataset. I had never run a backfill at Amazon-scale. I learned a few things while planning and executing the backfill that I’d like to share.

Backfill Steps

Backfills need careful planning so you don’t take down production systems. It can be challenging and resource-intensive. This is the plan I followed (and recommend):

  1. Plan the backfill, considering the potential impacts on the system and its users.
  2. Communicate with other stakeholders. Let them know about the planned backfill and any potential disruptions it may cause.
  3. Test the process on a smaller scale to ensure it will work as expected on the full production system.
  4. Run and monitor the backfill process to identify and address potential issues.
  5. Upon completion, verify that the backfill updated the records as you intended.
  6. Document any issues that the backfill hit.

It’s easy to overlook one of these steps, and risky to skip one! For example, neglecting to communicate to a stakeholder could cause problems. Let’s say you run the backfill without their knowledge and they get paged. Would the affected team know to reach out to you?

Let’s go through each step in more detail.

Plan

Planning how to run the backfill is the most important step. I wrote and circulated a design document that covered the following areas:

How will the backfill work?

Some questions I addressed include:

What can go wrong?

Once we have a happy path flow and diagrams of affected systems, consider which parts can fail. Some starting considerations:

Prepare for Edge Cases

Edge cases have a way of showing up when you’re processing millions of items. Something that happens once in a million is a real case to consider. If the backfill requires 100%, that every edge case, including malformed data.

You won’t be able to anticipate every edge case. Plan time to diagnose and address them. They’ll show up.

Communicate

Create a document and a checklist that outlines the specific steps you will take to run the backfill. Include details about what you’re backfilling and when, how to run it, and what metrics you’ll monitor.

Have a plan in place for how to respond to any issues that arise during the backfill. This could include steps for identifying issues and how to halt the backfill.

Request Feedback!

Once you finish the plan for your backfill, confirm it with others.

As a starting point, run it by stakeholders for the involved systems. For example, let’s say you’re planning to query another service to get all the production records. Is the service owner aligned with that approach?

For larger backfills, reach out to colleagues that can identify potential blind spots. Feedback is a good thing!

Test

Once you’ve planned how to run the backfill, and how it will work, the next phase is running small-scale tests.

Create a Test Environment

Create a test environment that mirrors the production environment. This ensures that the test results reflect how the backfill will behave. This could include a “shadow” or staging environment which acts like production.

If that’s not possible, what about creating a test of test identifiers? Can you create a set of records which match what currently exists in production?

Dry Run

It’s great to be able to preview what the script will do before you do it. A “dry run” mode is a way of allowing the backfill to run without making production changes. During a dry run, the backfill logs what it would do without actually doing it.

The dry run should be the default option. Running in production should be difficult to do by accident. I recommend making the production mode flag the one you have to opt into. For exmaple: having a flag for -–production or -–perform-disruptive-backfill. Whatever you need to make it ominous enough to cause pause.

Run a Small Backfill

Choose a subset of identifiers for the backfill, such as those from a small or less risky data set. For example, you may want to choose a group of known test identifiers, or a lesser-used set of IDs to start. You can then follow the rest of the backfill steps and treat it as you would the full production backfill.

Monitor

Establish a set of metrics that will help understand the backfill’s performance. These metrics may include:

  1. The amount of data the backfill processed
  2. The rate at which the backfill is running
  3. Any errors or issues that arise during the backfill.

Then, set up a system for monitoring the backfill in real-time. This could involve creating dashboards and setting up alerts to notify you of any issues. When you’re running the backfill, having this monitoring in place offers peace-of-mind.

Verify

This sounds obvious. It is also something I neglected to do when designing my backfill solution.

I remember sitting in my design review session. A Principal Engineer asked me how I planned to verify that it worked. I answered that the design included a way to check that the backfill processed every record.

I later found that seeing it backfilled a record is not the same as the backfill doing what I wanted.

Tooling is your friend here. Build a way to verify that the solution is what you expect to see once the backfill processes each record. This could be a command-line script, a scheduled job, an offline export, or some combination.

I wrote a collection of command-line tools for verifying individual records. I then performed an offline analysis to see where the backfilled records had gaps or issues. As I identified and fixed the issues, I re-backfilled the affected records.

My backfill didn’t go smoothly at first. I worked through the issues and we built a set of tools which had enduring value, far past the initial backfill.

Document

After the backfill, you’ve likely learned all sorts of interesting things you didn’t know at the start. It’s now, before declaring victory, that it’s best to capture the results of what you’ve done.

Ideas for what to capture:

  1. Results: How did it go? How many records backfilled as you expected? How many needed manual intervention? How long did the process take? What production impact did you observe on up- or down-stream systems?
  2. Steps to Reproduce: If we need to run the backfill again, do you have the steps written down where the team can find them? If you’re out of the office, will they be able to complete the backfill without you?
  3. Recommended Changes: What tooling do you wish you had? What would you do next time? Did the test environment work as well as you’d hoped? Are there longer-term initiatives to prioritize, such as creating a staging environment?

🎉

When you’re done, send out an announcement that backfill is complete! You’ve earned it. This encourages you to gather a concrete set of metrics and impact. (It can be helpful when filling in annual performance reviews or promotion documents!)

Executing a large-scale production backfill requires careful planning. With these steps, I hope you will feel more prepared when you run your next one. I wish you luck!